blog,bridge-core-3.0.1,qodef-qi--no-touch,qi-addons-for-elementor-1.5.3,qodef-back-to-top--enabled,,qode-essential-addons-1.4.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,qode-theme-ver-28.7,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,qode_header_in_grid,wpb-js-composer js-comp-ver-6.9.0,vc_responsive,elementor-default,elementor-kit-15999

Blog

5/13, The wall is out, the pad is set, and footing and drainage lines beginning to take shape.  In good shape to start setting formwork and drainage next week, right on schedule. School Fees have been paid and we're awaiting final documents.  With two 1/2 weeks...

5/04, We're really excited to have finally gotten our permit approvals from the Town of Corte Madera and issuance should follow shortly. In the meantime we can start our site excavation and clearing debris, moving irrigation and lighting and removing the exterior stone pad.  Jose insisted...

A great diagram can explain so much, and empower strategic systems thinking toward better buildings. A Life Cycle Assessment is the most detailed picture of carbon dioxide equivalent emissions - "eCO2e" or just "Carbon" for short - that we have. Recent studies have shown that...

Design-Build saves the client time and money while taking headache of managing the designer-contractor relationship off the client. Crafted Earth offers both Design and Design-Build, but for expediency and quality assurance we recommend Design-Build....

Below is a graph built upon the schedule of costs for a building permit in San Rafael, outlined here.  Many other possible permit fees may apply, depending on the nature of the work.  San Rafael lays them out pretty comprehensively here. ...